
The sewage treatment plant in the Tianjing area of Dali Economic and Technological Development Zone is responsible for the flow and purification treatment of domestic sewage in the area.
Deploy 3 sets of T3-E rail mounted robots to monitor the aeration operation status, concentration, temperature, and humidity of hazardous gases such as hydrogen sulfide, ammonia, oxygen, and methane in the biochemical reaction tank of the sewage treatment plant in real-time, ensuring the effective operation of the sewage biochemical treatment process and solving the inspection problem after the tank is covered.
Dynamic inspection and online monitoring of biological reaction tanks, observation of aeration conditions, intelligent judgment of aeration strength, and precise operation and control of biological tanks by process personnel in sewage treatment plants have been achieved, promoting the construction and development of digital transformation and intelligent upgrading in the water industry.
Inspection Distance
300mIdentification Accuracy
99%ROI Payback Period
≤1.5 Years