* Press Enter to search or ESC to close

Hangzhou City Underground Power Tunnel Intelligent Inspection Demonstration Project


      
<< Return Home > 应用场景案例 > > Application scenario cases > Hangzhou City Underground Power Tunnel Intelligent Inspection Demonstration Project
Project Overview

Hangzhou Xiasha District will all the high-voltage lines along the line "up to change down", moved into the underground corridor.  The double warehouse power tunnel with a diameter of 4 meters and a length of 3.8 kilometers is built, with an average depth of 15 meters. 

 

Plan Explanation

Four sets of T3-C rail-mounted robots with integrated AI algorithms and T-ONE industrial Internet platform AI inspection system were deployed to form an intelligent system of detection, monitoring and early warning, which was applied to the 7.6-kilometer underground power tunnel in Xiasha District, Hangzhou.  It can realize real-time monitoring of the operating status of equipment and environmental conditions inside the tunnel, and has functions such as fast and accurate location of cable faults and prediction of tunnel fault risk trends with big data.  It can completely replace the manual to complete the routine inspection task of the equipment in the power tunnel. 

                    

Benefit Presentation

实现长距离地下管廊无人化值守,智能预警,机器人巡检时长由原本8h缩短为2.5h每次。该项目被评为杭州地区电缆隧道智能化巡检的示范工程。