Intelligent Inspection Project of the Cable Tunnel of Guangzhou Chuting Guangnan Line


      
<< Return Home > 应用场景案例 > > Application scenario cases > Intelligent Inspection Project of the Cable Tunnel of Guangzhou Chuting Guangnan Line
Project Overview

The Chuting-Guangnan Double Circuit Cable Line Project and Tunnel is the longest 500KV land cable in the country, with a total length of 19.5 kilometers. The goal of the project is to achieve intelligent inspection of the cable tunnel area.

Plan Explanation

Deployed 8 sets of T3-C track-hanging robots integrating sky computing AI algorithm sets and T-ONE industrial Internet platform AI inspection systems to be applied to underground power tunnels in Panyu District, Guangzhou City. It realizes real-time monitoring of the operating status and environmental conditions of equipment inside the tunnel, and has functions such as quickly and accurately locating cable fault locations, alarming abnormal heat sources such as fireworks, and predicting big data tunnel fault risk trends. It can completely replace manual work to complete daily inspection tasks of equipment in power tunnels.

                     

Benefit Presentation