
Hebei Construction Investment Tangshan Leting Bodhi Island Offshore Wind Farm has a total installed capacity of 300 MW, and a total of 75 wind turbines with a single unit capacity of 4 MW have been installed. The wind turbines are all standing at sea level.
A total of 75 sets of T3-F track-mounted robots have been deployed, covering all wind turbine cabins of Tangshan Bodhi Island Offshore Wind Farm. They integrate celestial calculation-equipment health management, scene environment monitoring, structural defect identification, and meter status reading type algorithms to quickly and accurately Monitor the operating status of on-site equipment, and conduct periodic statistics and data analysis through the Tianchuang Robot Diagnosis and Early Warning Platform to provide data support for equipment predictive maintenance. Achieve a collaborative solution for wind power cabin inspection, operation and maintenance on the power generation side.
The wind power nacelle inspection cycle has been increased from once every half a month to all-weather inspection, and defects are discovered and maintained early, avoiding the expansion of equipment failures caused by delay in defects; the standardization and standardization of inspection inspections have been significantly improved, and the inspection quality has been controllable. Under control, the planned maintenance rate has increased by 87%, saving 3 million yuan in operation and maintenance costs every year. Assist the construction of smart wind farm infrastructure and create digital smart energy.
Running Time
30min*12 Times/DayInspection Points
6000/DayNumber of Inspections
75 offshore wind turbine cabins